Train 6M28 Barrow Hill Up Sdgs No 2-3 to Tunstead Sdgs (Fhh)

Operated By Freightliner, Runs Only If Required

Beighton Jn

3min Pathing Allowance

p. 0754

Woodhouse Jn

1min Pathing Allowance

p. 0800

Woodburn Jn

1min Eng. Allowance

p. 0807

Nunnery Main Line Jn

Booked To Wait

a. 0811

d. 0823

Sheffield

2min Pathing Allowance

p. 0825

p. 0835

p. 0836

Bamford

1min Eng. Allowance
1min Pathing Allowance

p. 0846

p. 0855

p. 0902

Great Rocks Jn

Stops For Operating Reasons

a. 0915

d. 0917

Schedule Info

Departing Wed 05/02/2025
Created Sat 12/10/24 19:40
Validity 16/12/24 until 16/05/2025
Schedule ID H45532 (10844743)
Schedule Type WTT
Duration 01 hrs 38 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In