Train 6M03 Barrow Hill Up Sdgs No 2-3 to Tunstead Sdgs (Fhh)

Operated By Freightliner, Runs Only If Required

Beighton Jn

1min Pathing Allowance

p. 1209

p. 1214

Woodburn Jn

1min Eng. Allowance

p. 1220

Sheffield

Booked To Wait

a. 1225

d. 1228

Heeley Up Loop

Booked To Wait

a. 1234

d. 1250

p. 1253

p. 1255

Bamford

1min Eng. Allowance

p. 1305

Earles Sdgs S.B.

Crew Change (if necessary)

a. 1309

d. 1311

p. 1320

p. 1326

a. 1339

d. 1341

Schedule Info

Departing Wed 05/02/2025
Created Sat 12/10/24 19:40
Validity 16/12/24 until 16/05/2025
Schedule ID H45515 (10844738)
Schedule Type WTT
Duration 01 hrs 47 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In