Train 6M01 Barrow Hill Up Sdgs No 2-3 to Tunstead Sdgs (Fhh)

Operated By Freightliner, Runs Only If Required

Barrow Hill North Jn

2min Pathing Allowance

p. 2203

Beighton Jn

3min Pathing Allowance

p. 2212

Woodhouse Jn

3min Pathing Allowance

p. 2218

Woodburn Jn

1min Performance Allowance
1min Eng. Allowance

p. 2227

p. 2233

p. 2240

p. 2241

Bamford

1min Eng. Allowance

p. 2251

Earles Sdgs S.B.

1min Pathing Allowance

p. 2254

p. 2300

p. 2307

p. 2320

Schedule Info

Departing Wed 05/02/2025
Created Sat 12/10/24 19:40
Validity 17/12/24 until 16/05/2025
Schedule ID H45513 (10844757)
Schedule Type WTT
Duration 01 hrs 25 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In