Train 6H95 Radlett Redland Roadstone to Tunstead Sdgs (Fhh)

Operated By Freightliner, Runs Only If Required

Harpenden Jn

5min Pathing Allowance

p. 2356

Luton

1min Pathing Allowance

p. 0007

Leagrave Jn

1min Pathing Allowance

SL

p. 0011

Flitwick

3min Pathing Allowance

p. 0019

Bedford South Jn.

1min Eng. Allowance

DSL

p. 0030

Bedford

Crew Change (if necessary)

Plat 3 DSL

a. 0033

d. 0039

p. 0043

p. 0051

p. 0103

Kettering Sth Jn

9min Eng. Allowance

p. 0107

p. 0117

Kilby Bridge Jn

2min Eng. Allowance

SL

p. 0140

Wigston North Jn

2min Pathing Allowance

DFL

p. 0146

p. 0153

p. 0159

p. 0202

p. 0207

p. 0215

p. 0216

p. 0218

Toton Centre

1min Eng. Allowance

p. 0219

p. 0223

p. 0236

p. 0243

Chesterfield

5min Pathing Allowance

Plat 1 ML

p. 0246

Tapton Jn

2min Pathing Allowance

p. 0252

p. 0304

p. 0306

Bamford

1min Eng. Allowance

p. 0317

p. 0325

p. 0332

Great Rocks Jn

Stops For Operating Reasons

a. 0345

d. 0355

Schedule Info

Departing Tue 04/02/2025
Created Thu 10/10/24 19:40
Validity 16/12/24 until 15/05/2025
Schedule ID H45436 (10812675)
Schedule Type WTT
Duration 04 hrs 17 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Building Materials (TLF) (B6)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In