Train 6M22 Bow East (Db Cargo) to Db Cargo Fan A And B Sdgs

Operated By DB Cargo, Runs Only If Required

d. 0310

p. 0315

p. 0317

p. 0317

p. 0322

p. 0325

p. 0326

p. 0329

p. 0330

p. 0334

Hampstead Heath

1min Pathing Allowance

p. 0336

p. 0339

p. 0342

Harlesden Jn

1min Pathing Allowance

p. 0346

Willesden Railnet Receptn

1min Pathing Allowance

Plat HLG HLG

p. 0350

p. 0354

a. 0359

Schedule Info

Departing Sat 30/03/2024
Created Thu 31/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID H43997 (7092897)
Schedule Type WTT
Duration 00 hrs 49 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs as required
Service Code 52122427
Flow Info DBC UK: Dowlow to Chesterton Jn
Member Info Log In