Train 6M12 Tinsley S.S. to Seaforth C.T. Mdhc (Ews)

Operated By DB Cargo, Runs Only If Required

d. 2323

p. 2327

Tinsley South Jn

Stops For Operating Reasons
2min Pathing Allowance

a. 2329

d. 2331

Tinsley East Jn

2min Eng. Allowance
3min Pathing Allowance

p. 2335

Rotherham Central

1min Pathing Allowance

p. 2343

p. 2349

p. 2352

p. 0003

p. 0004

p. 0015

p. 0018

p. 0021

Wakefield Kirkgate

Crew Change (if necessary)
Booked To Wait
3min Eng. Allowance

FL

a. 0024

d. 0031

p. 0040

p. 0051

p. 0055

Bradley Jn

1min Pathing Allowance

p. 0057

p. 0102

p. 0127

p. 0137

p. 0140

Stalybridge

1min Pathing Allowance

p. 0146

p. 0153

p. 0156

Denton Station Jn

Booked To Wait

a. 0158

d. 0221

p. 0226

p. 0227

Stockport

1min Pathing Allowance

p. 0230

p. 0233

p. 0236

p. 0239

p. 0241

p. 0251

p. 0252

p. 0253

p. 0255

p. 0301

Plumley West S.B.

1min Eng. Allowance

p. 0312

p. 0316

p. 0320

p. 0322

p. 0326

Acton Bridge

Booked To Wait

FL

a. 0330

d. 0332

p. 0337

p. 0344

p. 0349

Warrington Bank Quay

Crew Change (if necessary)

Plat 4 SL

a. 0353

d. 0356

p. 0403

p. 0407

Earlstown Up & Down Loop

Booked To Wait

a. 0408

d. 0432

p. 0440

p. 0444

p. 0448

Roby

2min Eng. Allowance

p. 0448

Olive Mount Jn.

5min Pathing Allowance

p. 0454

p. 0502

p. 0516

Bootle Jn Stop Board

Stops For Operating Reasons

a. 0518

d. 0520

Strand Road Level Crossing

Stops For Operating Reasons

a. 0525

d. 0527

a. 0546

Schedule Info

Departing Thu 28/03/2024
Created Thu 15/02/24 21:00
Validity 14/12/23 until 30/05/2024
Schedule ID H43979 (8741546)
Schedule Type WTT
Duration 06 hrs 23 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2200
Service Type Metals (B1)
Characteristics Runs as required
Service Code 51426830
Flow Info DBC UK: Tinsley - Seaforth / Immingham / Doncaster
Member Info Log In