Train 6F80 Bescot Up Engineers Sdgs to Arpley Sidings

Operated By DB Cargo, Runs Only If Required

Bescot Up Engineers Sdgs

1min Pathing Allowance

d. 1840

Bescot Stadium

1min Eng. Allowance
3min Pathing Allowance

p. 1844

Darlaston Jn

6min Pathing Allowance

p. 1850

p. 1901

p. 1905

Penkridge

3min Pathing Allowance

p. 1913

p. 1924

p. 1926

p. 1931

Madeley (Staffs)

1min Eng. Allowance
3min Pathing Allowance

SL

p. 1946

p. 1957

p. 2002

Crewe Coal Yard

3min Pathing Allowance

p. 2003

p. 2018

Hartford Jn

1min Pathing Allowance

p. 2024

Acton Bridge

2min Pathing Allowance

p. 2028

p. 2032

p. 2039

p. 2043

a. 2047

Schedule Info

Departing Wed 24/04/2024
Created Thu 31/08/23 00:10
Validity 13/12/23 until 29/05/2024
Schedule ID H43659 (7091988)
Schedule Type WTT
Duration 02 hrs 07 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2000
Service Type RfD General Merchandise (UK Contracts) (J8)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 52406842
Flow Info DBC UK: General Freight Trip Services
Member Info Log In