Train 4V48 Acton T.C. to Tytherington

Operated By DB Cargo, Runs Only If Required

d. 0042

p. 0046

p. 0049

Southall

2min Pathing Allowance

Plat 3 RL

p. 0052

Heathrow Airport Jn

1min Eng. Allowance
5min Pathing Allowance

RL

p. 0056

Slough

5min Pathing Allowance

Plat 4 RL

p. 0110

p. 0121

Twyford

1min Eng. Allowance

Plat 3 RL

p. 0128

Kennet Bridge Jn

1min Pathing Allowance

DRL

p. 0134

p. 0137

p. 0139

Goring & Streatley

1min Eng. Allowance
2min Pathing Allowance

RL

p. 0146

p. 0156

Didcot Parkway

Crew Change (if necessary)
Booked To Wait
1min Pathing Allowance

Plat 3 RL

a. 0158

d. 0203

Foxhall Jn

1min Pathing Allowance

ML

p. 0207

p. 0214

Challow

2min Pathing Allowance

p. 0217

Uffington (Oxfordshire)

1min Eng. Allowance
1min Pathing Allowance

p. 0221

p. 0233

p. 0240

p. 0249

p. 0250

Thingley Jn

1min Eng. Allowance

p. 0251

p. 0259

Bath Spa

1min Eng. Allowance

p. 0301

p. 0313

p. 0315

p. 0319

p. 0320

Bristol Parkway

Booked To Wait
Crew Change (if necessary)
5min Pathing Allowance

a. 0323

d. 0327

p. 0338

p. 0341

Yate Middle

Stops For Operating Reasons

a. 0344

d. 0346

a. 0416

Schedule Info

Departing Fri 26/04/2024
Created Thu 31/08/23 00:10
Validity 12/12/23 until 31/05/2024
Schedule ID H43035 (7091673)
Schedule Type WTT
Duration 03 hrs 34 mins

Train Info

Operated By DB Cargo
Timed For 75mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 56161420
Flow Info DBC UK: Willesden ET to Calvert
Member Info Log In