Train 3J39 Harringay Up Rev Sdgs to Peterborough L.I.P.

Operated By GBRf, Runs Only If Required

d. 1905

SL2

p. 1908

Alexandra Palace

2min Pathing Allowance

p. 1910

Bowes Park

7min Pathing Allowance

p. 1914

Gordon Hill

1min Eng. Allowance
4min Pathing Allowance

p. 1925

p. 1941

Molewood Junction

1min Pathing Allowance

p. 1943

p. 1949

p. 1951

p. 1952

p. 1953

p. 1957

p. 2007

p. 2010

p. 2025

Holme Jn.

Booked To Wait

FL

a. 2037

d. 2112

p. 2119

p. 2120

a. 2125

Schedule Info

Departing Fri 29/03/2024
Created Fri 18/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID H42512 (6939086)
Schedule Type WTT
Duration 02 hrs 20 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Service Type Departmental (DD)
Characteristics Runs as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In