Train 3J32 Foxton to Harringay Up Rev Sdgs

Operated By GBRf, Runs Only If Required

d. 0406

p. 0418

p. 0430

Hitchin

Crew Change (if necessary)

Plat 1 SL

a. 0435

d. 0437

p. 0443

p. 0444

p. 0445

p. 0446

Molewood Junction

1min Eng. Allowance
1min Pathing Allowance

p. 0452

p. 0455

p. 0505

p. 0510

p. 0512

a. 0520

Schedule Info

Departing Thu 28/03/2024
Created Fri 18/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID H42493 (6939078)
Schedule Type WTT
Duration 01 hrs 14 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 715
Service Type Departmental (DD)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In