Train 3J30 Peterborough L.I.P. to Harringay Up Rev Sdgs

Operated By GBRf, Runs Only If Required

d. 0106

p. 0111

p. 0113

p. 0121

p. 0130

p. 0145

p. 0150

p. 0200

p. 0205

p. 0206

Langley Sth Jn

Booked To Wait

a. 0207

d. 0208

p. 0210

Molewood Junction

1min Eng. Allowance

p. 0215

p. 0218

p. 0228

p. 0232

Alexandra Palace

1min Eng. Allowance

Plat 2 SL2

p. 0235

a. 0242

Schedule Info

Departing Thu 28/03/2024
Created Fri 18/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID H42478 (6939073)
Schedule Type WTT
Duration 01 hrs 36 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 715
Service Type Departmental (DD)
Characteristics Runs as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In