Train 7X98 Toton North Yard to Bescot Up Engineers Sdgs

Operated By GBRf, Runs Only If Required

d. 1412

Long Eaton Town X

1min Pathing Allowance

ML

p. 1418

p. 1422

p. 1424

Castle Donington

1min Pathing Allowance

p. 1433

p. 1446

p. 1447

p. 1454

p. 1503

p. 1505

p. 1509

p. 1516

p. 1527

Kingsbury Jn

1min Eng. Allowance

p. 1536

p. 1542

p. 1545

p. 1548

p. 1549

Park Lane Jn West Mids

2min Eng. Allowance
6min Pathing Allowance

p. 1551

p. 1621

p. 1625

p. 1627

p. 1630

a. 1634

Schedule Info

Departing Sat 27/04/2024
Created Fri 18/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID H34101 (6946433)
Schedule Type WTT
Duration 02 hrs 22 mins

Train Info

Operated By GBRf
Timed For 45mph
Power Type Diesel Locomotive
Timing Load 2000
Service Type Civil Engineer (DH)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In