Train 6X42 Hoo Junction Up Yard to Eastleigh East Yard

Operated By GBRf, Runs Only If Required

d. 1405

p. 1414

Springhead Junction (Ctrl)

5min Pathing Allowance

p. 1416

Dartford

1min Pathing Allowance

Plat 2 UML

p. 1429

p. 1431

p. 1433

p. 1434

Sidcup

3min Pathing Allowance

p. 1440

Lee

1min Pathing Allowance

p. 1450

p. 1453

Parks Bridge Jn

4min Pathing Allowance

p. 1456

p. 1502

Lewisham Vale Junction

9min Pathing Allowance

UL

p. 1503

Nunhead

3min Pathing Allowance

p. 1516

Crofton Road Jn

2min Pathing Allowance

AL

p. 1522

p. 1526

p. 1530

p. 1532

Longhedge Jn

1min Pathing Allowance

p. 1534

p. 1538

Barnes

3min Pathing Allowance

p. 1545

Kew Bridge

3min Pathing Allowance

p. 1553

Brentford

3min Pathing Allowance

p. 1557

p. 1605

Hounslow Jn

2min Pathing Allowance

p. 1606

p. 1609

Feltham

2min Pathing Allowance

p. 1612

p. 1620

p. 1630

p. 1635

p. 1639

p. 1641

p. 1648

p. 1649

p. 1656

p. 1701

Fleet

1min Pathing Allowance

p. 1704

p. 1718

Worting Jn

Booked To Wait

a. 1722

d. 1724

p. 1739

p. 1745

Shawford Jn

7min Pathing Allowance

SL

p. 1749

RCL

p. 1801

a. 1804

Schedule Info

Departing Thu 28/03/2024
Created Fri 18/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID H34032 (6939025)
Schedule Type WTT
Duration 03 hrs 59 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 1495
Service Type Civil Engineer (DH)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In