Train 4H83 March Up Yard Gbrf to Middleton Towers Gbrf

Operated By GBRf, Runs Only If Required

d. 0338

p. 0341

p. 0343

p. 0345

Manea Signal Ca924

1min Eng. Allowance

p. 0347

p. 0354

p. 0357

p. 0403

p. 0413

Watlington

1min Eng. Allowance

p. 0417

Kings Lynn T.C. Gbrf

Stops to Amend Train Formation
Reversal / Run Around

a. 0428

d. 0448

a. 0508

Schedule Info

Departing Fri 29/03/2024
Created Fri 25/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID H32807 (7051352)
Schedule Type WTT
Duration 01 hrs 30 mins

Train Info

Operated By GBRf
Timed For 75mph
Power Type Diesel Locomotive
Timing Load 600
Service Type RfD Industrial Minerals (UK Contracts) (J4)
Characteristics Runs to Terminals/Yards as required
Service Code 51464780
Flow Info GB Railfreight : Sand; Middleton Towers-Barnby Dun/Monk Bretton/Goole Glassworks
Member Info Log In