Train 6F25 Bescot Up Engineers Sdgs to Arpley Sidings

Operated By DB Cargo, Runs Only If Required

Bescot Stadium

1min Pathing Allowance

p. 2038

p. 2040

Bushbury Jn Signal Sb4695

Booked To Wait

a. 2047

d. 2104

p. 2106

Penkridge

1min Pathing Allowance

p. 2115

p. 2122

Madeley (Staffs)

1min Eng. Allowance

SL

p. 2139

Crewe Signal Bh34

Booked To Wait

a. 2153

d. 2224

Crewe Coal Yard

1min Pathing Allowance

SL

p. 2233

Winsford

1min Pathing Allowance

FL

p. 2244

Hartford Jn

1min Pathing Allowance

p. 2251

p. 2254

p. 2256

p. 2304

p. 2308

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 19/12/24 until 15/05/2025
Schedule ID H28264 (10494449)
Schedule Type WTT
Duration 02 hrs 36 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 1200
Service Type RfD General Merchandise (UK Contracts) (J8)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 52406842
Flow Info DBC UK: General Freight Trip Services
Member Info Log In