Train 4M03 Doncaster Down Decoy Gbrf to Peak Forest Cemex Gbrf

Operated By GBRf, Runs Only If Required

p. 1243

Bridge Jn

5min Pathing Allowance

GL

p. 1245

St James Jn

5min Pathing Allowance

p. 1251

p. 1259

p. 1304

p. 1308

p. 1309

p. 1312

p. 1313

Wincobank Jn.

1min Eng. Allowance

p. 1315

p. 1320

Heeley Up Loop

Booked To Wait

a. 1327

d. 1350

p. 1353

p. 1354

Bamford

1min Eng. Allowance

p. 1404

p. 1412

p. 1419

Peak Forest S.B.

Driver Changes Ends
Shunting Move

a. 1431

d. 1437

Peak Forest Cemex Gbrf

Shunting Move

a. 1447

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID H25588 (10465489)
Schedule Type WTT
Duration 02 hrs 06 mins

Train Info

Operated By GBRf
Timed For 75mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 51464580
Flow Info GBRf Tarmac Various - Aggregates
Member Info Log In