Train 6X42 Hoo Junction Up Yard to Eastleigh East Yard

Operated By GBRf, Runs Only If Required

p. 1422

Springhead Junction (Ctrl)

5min Pathing Allowance

p. 1424

p. 1437

p. 1438

Crayford Spur B

1min Pathing Allowance

p. 1440

Crayford

2min Pathing Allowance

p. 1442

Sidcup

2min Pathing Allowance

p. 1451

Lee

p. 1500

Hither Green

Booked To Wait

Plat 5 SL

a. 1503

d. 1505

p. 1509

p. 1512

Nunhead

3min Pathing Allowance

p. 1517

Crofton Road Jn

2min Pathing Allowance

AL

p. 1522

p. 1530

p. 1532

Longhedge Jn

1min Pathing Allowance

p. 1534

Barnes

3min Pathing Allowance

p. 1545

Kew Bridge

3min Pathing Allowance

p. 1553

Brentford

3min Pathing Allowance

p. 1557

p. 1605

Hounslow Jn

2min Pathing Allowance

p. 1606

p. 1609

Feltham

2min Pathing Allowance

p. 1612

p. 1620

p. 1635

p. 1639

p. 1641

p. 1648

p. 1649

p. 1656

Fleet

1min Pathing Allowance

p. 1704

p. 1718

Worting Jn

Booked To Wait

a. 1722

d. 1724

p. 1745

Shawford Jn

7min Pathing Allowance

SL

p. 1749

RCL

p. 1801

Schedule Info

Departing Wed 10/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID H24853 (8831406)
Schedule Type WTT
Duration 03 hrs 51 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 1495
Service Type Civil Engineer (DH)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In