Train 6L63 Barnby Dun Roc. Glass Gbrf to March Up Yard Gbrf

Operated By GBRf, Runs Only If Required

d. 2030

Kirk Sandall Jn

Driver Changes Ends
Booked To Wait

a. 2038

d. 2043

Bentley Jn

1min Eng. Allowance
2min Pathing Allowance

p. 2046

p. 2053

p. 2055

Doncaster Robert Rds Shed

Reversal / Run Around
Stops For Operating Reasons
Stops to Couple Vehicles

a. 2100

d. 2151

p. 2156

WSL

p. 2157

p. 2200

Doncaster Down Decoy Gbrf

Crew Change (if necessary)

a. 2203

d. 2209

p. 2211

p. 2212

p. 2230

p. 2231

p. 2242

p. 2247

West Holmes Jn

1min Eng. Allowance

p. 2248

p. 2251

p. 2251

Metheringham

1min Eng. Allowance

p. 2302

p. 2313

p. 2314

p. 2325

p. 2333

Glinton Junction

2min Eng. Allowance

p. 2346

Werrington Jn

3min Pathing Allowance

SL

p. 2350

New England Nth Jn.

May Stop to Allow Train to Pass

p. 2357

Peterborough Virtual Gbrf

Stops For Operating Reasons

a. 0001

d. 0122

P'Boro Eastfield Jn.

1min Pathing Allowance

SUD

p. 0124

p. 0126

p. 0127

p. 0129

p. 0133

p. 0135

p. 0137

Three Horse Shoes

1min Eng. Allowance
3min Pathing Allowance

p. 0139

p. 0148

p. 0148

March South

Driver Changes Ends
Shunting Move

a. 0150

d. 0154

a. 0159

Schedule Info

Departing Thu 05/09/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID H24421 (8831173)
Schedule Type WTT
Duration 05 hrs 29 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type RfD Industrial Minerals (UK Contracts) (J4)
Characteristics Runs to Terminals/Yards as required
Service Code 51464780
Flow Info GB Railfreight : Sand; Middleton Towers-Barnby Dun/Monk Bretton/Goole Glassworks
Member Info Log In