Train 6J47 Peak Forest Cemex Gbrf to Hope St Peakstone P.Sdgs

Operated By GBRf, Runs Only If Required

Peak Forest Long Sidings

Stops to Amend Train Formation
Reversal / Run Around

a. 2128

d. 2148

New Mills South Jn

1min Eng. Allowance
1min Pathing Allowance

p. 2207

Hazel Grove

3min Pathing Allowance

p. 2219

p. 2228

p. 2228

p. 2229

p. 2241

Ashton Moss North Jn

Booked To Wait

a. 2247

d. 2253

Baguley Fold Jn

2min Eng. Allowance

p. 2257

Miles Platting

2min Pathing Allowance

SL

p. 2301

p. 2310

Schedule Info

Departing Wed 02/10/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID H24382 (8831150)
Schedule Type WTT
Duration 01 hrs 56 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2400
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 51464580
Flow Info GBRf Tarmac Various - Aggregates
Member Info Log In