Train 6H03 Wellingborough Up Tc Gbrf to Peak Forest Cemex Gbrf

Operated By GBRf, Runs Only If Required

d. 1139

Wellingborough Sig Bk6065

Driver Changes Ends
Shunting Move

DSL

a. 1151

d. 1153

p. 1157

p. 1202

p. 1224

Wigston North Jn

Booked To Wait

DFL

a. 1229

d. 1234

p. 1240

p. 1241

Humberstone Road

Booked To Wait

GL

a. 1244

d. 1250

p. 1251

p. 1256

Sileby Jn

2min Pathing Allowance

p. 1259

p. 1307

Loughborough North Jn

2min Pathing Allowance

SL

p. 1309

East Midlands Parkway

Crew Change (if necessary)
Booked To Wait

a. 1319

d. 1325

p. 1325

p. 1327

p. 1330

p. 1331

Toton Centre

Booked To Wait
1min Eng. Allowance

ML

a. 1334

d. 1336

p. 1343

p. 1356

p. 1403

p. 1407

p. 1408

p. 1417

Dore West Jn

Booked To Wait

a. 1420

d. 1428

Grindleford

2min Pathing Allowance

p. 1435

Bamford

1min Eng. Allowance
2min Pathing Allowance

p. 1441

Earles Sidings Sig Es31

1min Pathing Allowance

p. 1450

p. 1454

p. 1501

Peak Forest S.B.

Driver Changes Ends
Shunting Move

a. 1511

d. 1517

Peak Forest Cemex Gbrf

Shunting Move

a. 1527

Schedule Info

Departing Tue 09/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID H24305 (8831115)
Schedule Type WTT
Duration 03 hrs 48 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 51464580
Flow Info GBRf Tarmac Various - Aggregates
Member Info Log In