Train 6M93 Dagenham Down Yard to Hope (Earles Sidings) Fhh

Operated By Freightliner, Runs Only If Required

d. 2304

Dagenham Ford Mc Sig Ur826

Stops For Operating Reasons

a. 2306

d. 0006

Dagenham Dock

1min Performance Allowance

ML

p. 0009

p. 0012

p. 0013

p. 0014

Barking Station Junction

1min Pathing Allowance

p. 0015

p. 0018

p. 0022

South Tottenham

3min Pathing Allowance

p. 0028

Harringay Park Jn

2min Pathing Allowance

p. 0036

p. 0041

p. 0042

Carlton Road Jn

Booked To Wait

SL

a. 0046

d. 0058

p. 0101

p. 0102

p. 0103

p. 0105

Silkstream Junction

2min Pathing Allowance

p. 0106

p. 0116

p. 0122

p. 0127

p. 0133

p. 0136

Flitwick

1min Eng. Allowance

p. 0143

p. 0152

Bedford

Crew Change (if necessary)

Plat 2 DSL

a. 0154

d. 0156

Bedford North Jn.

1min Pathing Allowance

DFL

p. 0159

Sharnbrook Jn.

5min Pathing Allowance

p. 0209

Wellingborough

3min Pathing Allowance

p. 0224

p. 0229

Kettering Sth Jn

2min Pathing Allowance

p. 0232

p. 0236

p. 0238

Market Harborough

2min Pathing Allowance

p. 0247

Kilby Bridge Jn

2min Eng. Allowance
1min Pathing Allowance

p. 0301

Wigston North Jn

3min Pathing Allowance

p. 0307

p. 0314

Leicester North Jn.

1min Pathing Allowance

GL

p. 0315

Humberstone Road

Booked To Wait

GL

a. 0320

d. 0353

p. 0354

p. 0358

Sileby Jn

2min Pathing Allowance

p. 0401

Loughborough

6min Pathing Allowance

Plat 1 FL

p. 0408

Trent South Jn

1min Pathing Allowance

p. 0422

Trent East Jn

2min Pathing Allowance

ML

p. 0424

p. 0428

Toton Centre

1min Eng. Allowance

p. 0429

Trowell Jn

1min Pathing Allowance

p. 0433

p. 0439

Ironville Junction

2min Pathing Allowance

p. 0443

Alfreton

2min Pathing Allowance

p. 0449

p. 0458

p. 0501

Chesterfield

5min Eng. Allowance

Plat 1 ML

p. 0502

Tapton Jn

2min Pathing Allowance

p. 0508

p. 0520

p. 0522

p. 0523

p. 0529

p. 0533

p. 0536

a. 0538

Schedule Info

Departing Fri 19/04/2024
Created Tue 15/08/23 00:10
Validity 15/12/23 until 31/05/2024
Schedule ID H22895 (6848834)
Schedule Type WTT
Duration 06 hrs 34 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Building Materials (TLF) (B6)
Characteristics Runs to Terminals/Yards as required
Service Code 57620470
Flow Info Freightliner - LaFarge Cement
Member Info Log In