Train 6M87 Dewsbury Blue Circle to Hope (Earles Sidings) Fhh

Operated By Freightliner

d. 1301

Dewsbury East Jn

2min Eng. Allowance

p. 1307

p. 1315

Wakefield Kirkgate

Booked To Wait

a. 1321

d. 1325

Calder Bridge Jn

2min Pathing Allowance

p. 1328

p. 1332

p. 1335

Hemsworth Loop

Booked To Wait

a. 1342

d. 1358

p. 1401

Moorthorpe

5min Pathing Allowance

p. 1403

Swinton (S.Yorks)

2min Pathing Allowance

p. 1416

p. 1420

p. 1424

p. 1427

p. 1428

Broughton Lane Jn

1min Pathing Allowance

p. 1429

Woodburn Jn

1min Eng. Allowance
2min Pathing Allowance

p. 1434

p. 1439

Sheffield

Booked To Wait

a. 1441

d. 1446

p. 1452

p. 1455

p. 1456

p. 1501

p. 1505

p. 1508

a. 1510

Schedule Info

Departing Tue 26/03/2024
Created Wed 21/02/24 20:42
Validity 11/03/24 until 31/05/2024
Schedule ID H22874 (8851511)
Schedule Type WTT
Duration 02 hrs 09 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Building Materials (TLF) (B6)
Service Code 57620470
Flow Info Freightliner - LaFarge Cement
Member Info Log In