Train 6M28 Barrow Hill Up Sdgs No 2-3 to Tunstead Sdgs

Operated By Freightliner, Runs Only If Required

d. 0745

Beighton Jn

2min Pathing Allowance

p. 0754

Woodhouse Jn

1min Pathing Allowance

p. 0759

Woodburn Jn

1min Eng. Allowance
1min Pathing Allowance

p. 0806

Nunnery Main Line Jn

Booked To Wait

a. 0811

d. 0824

Sheffield

3min Pathing Allowance

p. 0827

p. 0837

p. 0838

p. 0839

p. 0844

p. 0848

p. 0851

p. 0854

p. 0856

p. 0903

p. 0905

p. 0907

p. 0913

Great Rocks Jn

Stops For Operating Reasons

a. 0915

d. 0917

a. 0923

Schedule Info

Departing Fri 26/04/2024
Created Tue 15/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID H22821 (6844648)
Schedule Type WTT
Duration 01 hrs 38 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In