Train 6M01 Barrow Hill Up Sdgs No 2-3 to Tunstead Sdgs

Operated By Freightliner, Runs Only If Required

d. 2201

Barrow Hill North Jn

2min Pathing Allowance

p. 2203

Beighton Jn

3min Pathing Allowance

p. 2212

Woodhouse Jn

3min Pathing Allowance

p. 2218

Woodburn Jn

1min Performance Allowance
1min Eng. Allowance

p. 2227

p. 2231

p. 2233

p. 2240

Dore West Jn

1min Pathing Allowance

p. 2241

p. 2243

p. 2248

p. 2252

p. 2255

Earles Sidings Sig Es31

2min Pathing Allowance

p. 2258

p. 2302

p. 2309

p. 2311

p. 2313

p. 2319

Great Rocks Jn

Stops For Operating Reasons

a. 2321

d. 2330

a. 2336

Schedule Info

Departing Fri 19/04/2024
Created Tue 15/08/23 00:10
Validity 12/12/23 until 31/05/2024
Schedule ID H22805 (6848498)
Schedule Type WTT
Duration 01 hrs 35 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In