Train 6H80 Ratcliffe Heavy Haul to Tunstead Sdgs

Operated By Freightliner, Runs Only If Required

d. 1028

p. 1033

p. 1035

p. 1037

Toton Centre

1min Eng. Allowance

GL

p. 1039

p. 1045

p. 1050

p. 1054

p. 1057

p. 1104

p. 1107

Chesterfield

Booked To Wait

Plat 1 ML

a. 1109

d. 1110

Tapton Jn

4min Pathing Allowance

p. 1112

p. 1126

p. 1128

Totley Tunnel East

4min Pathing Allowance

p. 1130

p. 1139

p. 1143

p. 1146

Earles Sidings Sig Es31

2min Pathing Allowance

p. 1150

p. 1154

p. 1201

p. 1203

p. 1205

p. 1211

Great Rocks Jn

Stops For Operating Reasons

a. 1213

d. 1215

a. 1221

Schedule Info

Departing Fri 19/04/2024
Created Tue 15/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID H22713 (6844611)
Schedule Type WTT
Duration 01 hrs 53 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In