Train 6E69 Tunstead Sdgs to Peterborough West Yard

Operated By Freightliner, Runs Only If Required

d. 0703

p. 0709

p. 0713

Chinley South Jn

1min Pathing Allowance

p. 0721

p. 0725

p. 0734

p. 0736

Earles Sdgs S.B.

2min Pathing Allowance

p. 0738

Bamford

2min Eng. Allowance

p. 0743

Grindleford

1min Eng. Allowance

p. 0750

p. 0756

Dore West Jn

2min Pathing Allowance

p. 0759

Dore South Jn

1min Pathing Allowance

p. 0803

p. 0816

p. 0817

p. 0818

p. 0820

p. 0829

p. 0832

Langley Mill

1min Eng. Allowance

p. 0836

Trowell Jn

1min Eng. Allowance

SL

p. 0842

Toton Centre

Booked To Wait

HL

a. 0848

d. 0849

p. 0852

p. 0854

p. 0858

p. 0900

p. 0913

p. 0921

p. 0926

p. 0927

Frisby

1min Pathing Allowance

p. 0938

Melton Mowbray

1min Pathing Allowance

p. 0943

p. 0948

p. 0953

p. 0956

p. 0958

Oakham

1min Pathing Allowance

p. 1000

p. 1005

p. 1009

p. 1012

Uffington Sb (Lincs)

1min Eng. Allowance

p. 1019

p. 1024

New England Nth Jn.

3min Pathing Allowance

GL

p. 1029

P'Boro Eastfield Jn.

Booked To Wait

a. 1037

d. 1047

a. 1050

Schedule Info

Departing Thu 18/04/2024
Created Mon 15/04/24 19:40
Validity 11/12/23 until 31/05/2024
Schedule ID H22639 (9284771)
Schedule Type WTT
Duration 03 hrs 47 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2000
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In