Train 6C83 Machen Quarry (Flhh) to Stoke Gifford (Fhh)

Operated By Freightliner

d. 1835

Park Jn

Stops For Operating Reasons

a. 1855

d. 1857

ML

p. 1900

p. 1902

Maindee West Jn

1min Pathing Allowance

p. 1904

p. 1906

Llanwern West Jn

1min Eng. Allowance
6min Pathing Allowance

p. 1909

p. 1929

Severn Tunnel Ugl

Booked To Wait

a. 1932

d. 1957

p. 1959

p. 2005

Pilning

1min Eng. Allowance

p. 2009

p. 2021

Bristol Parkway

Reversal / Run Around

a. 2025

d. 2049

Bristol Parkway Sig Bl6586

Driver Changes Ends
Shunting Move

a. 2051

d. 2054

a. 2104

Schedule Info

Departing Sat 30/03/2024
Created Tue 15/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID H22588 (6849642)
Schedule Type WTT
Duration 02 hrs 29 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2200
Service Type Aggregates (B4)
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In