Train 0D09 Hope (Earles Sidings) Fhh to Toton North Yard

Operated By Freightliner, Runs Only If Required

d. 1720

p. 1722

Bamford

1min Pathing Allowance

p. 1726

Grindleford

3min Eng. Allowance

p. 1731

p. 1738

Dore West Jn

1min Pathing Allowance

p. 1740

Dore South Jn

Booked To Wait

a. 1744

d. 1751

UBH

p. 1800

p. 1802

p. 1804

p. 1806

p. 1813

p. 1817

Langley Mill

1min Eng. Allowance

p. 1820

p. 1826

p. 1830

a. 1836

Schedule Info

Departing Sat 27/04/2024
Created Wed 04/10/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID H22287 (7476703)
Schedule Type WTT
Duration 01 hrs 16 mins

Train Info

Operated By Freightliner
Timed For 75mph
Power Type Diesel Locomotive
Service Type Light Locomotive (ZZ)
Characteristics Runs as required
Service Code 54606570
Flow Info Freightliner Infrastructure - Non Possession trains
Member Info Log In