Train 7A90 Merehead Quarry (Fhh) to Southall

Operated By Freightliner, Runs Only If Required

Merehead Quarry (Fhh)

Shunting Move

d. 2029

Whites Crossing Sdg

Driver Changes Ends
Shunting Move

a. 2035

d. 2037

p. 2046

p. 2054

p. 2101

p. 2104

p. 2110

p. 2113

p. 2124

p. 2140

p. 2158

Hungerford

1min Eng. Allowance

p. 2205

p. 2218

Theale

1min Eng. Allowance

p. 2234

p. 2240

p. 2241

p. 2243

p. 2245

Twyford

2min Pathing Allowance

Plat 4 RL

p. 2250

p. 2302

p. 2302

p. 2310

p. 2320

p. 2320

p. 2324

a. 2328

Schedule Info

Departing Tue 22/10/2024
Created Fri 02/08/24 20:02
Validity 21/10/24 until 23/10/2024
Schedule ID H22013 (10145572)
Schedule Type VARCompare WTT
Duration 02 hrs 59 mins

Train Info

Operated By Freightliner
Timed For 45mph
Power Type Diesel Locomotive
Timing Load 4200
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In