Train 7A90 Merehead Quarry (Fhh) to Hanwell Bridge Loop

Operated By Freightliner, Runs Only If Required

Merehead Quarry (Fhh)

Shunting Move

d. 2029

Whites Crossing Sdg

Driver Changes Ends
Shunting Move

a. 2035

d. 2037

p. 2101

p. 2104

p. 2110

p. 2113

p. 2124

p. 2140

p. 2158

Hungerford

1min Eng. Allowance

p. 2205

p. 2218

Theale

1min Eng. Allowance

p. 2234

p. 2240

p. 2241

p. 2243

p. 2245

p. 2250

p. 2259

p. 2307

GL

p. 2312

West Drayton

Booked To Wait
1min Pathing Allowance

Plat 5 RL

a. 2319

d. 2354

p. 0002

p. 0006

p. 0007

Schedule Info

Departing Thu 11/07/2024
Created Wed 28/02/24 20:40
Validity 03/06/24 until 13/12/2024
Schedule ID H22013 (8933075)
Schedule Type WTT
Duration 03 hrs 40 mins

Train Info

Operated By Freightliner
Timed For 45mph
Power Type Diesel Locomotive
Timing Load 4200
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In