Train 7A80 Merehead Quarry (Fhh) to Hanwell Bridge Loop

Operated By Freightliner, Runs Only If Required

Merehead Quarry (Fhh)

Shunting Move

d. 1841

Whites Crossing Sdg

Driver Changes Ends
Shunting Move

a. 1847

d. 1849

p. 1913

p. 1916

p. 1921

p. 1924

p. 1935

p. 1951

p. 2009

Hungerford

1min Eng. Allowance

p. 2016

p. 2029

Theale

1min Eng. Allowance

p. 2045

p. 2051

Oxford Road Jn

1min Pathing Allowance

DFR

p. 2052

Reading

Booked To Wait

Plat 13 URL

a. 2056

d. 2107

p. 2110

p. 2115

p. 2124

Slough

2min Pathing Allowance

Plat 5 RL

p. 2132

p. 2144

p. 2148

p. 2150

Schedule Info

Departing Tue 09/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H22011 (8860053)
Schedule Type WTT
Duration 03 hrs 11 mins

Train Info

Operated By Freightliner
Timed For 45mph
Power Type Diesel Locomotive
Timing Load 4200
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In