Train 6M46 Hanwell Bridge Loop to Neasden Charrington Flhh

Operated By Freightliner, Runs Only If Required

p. 1259

West Ealing

1min Eng. Allowance

Plat 4 RL

p. 1301

p. 1303

Acton Main Line

Crew Change (if necessary)

a. 1307

d. 1311

p. 1314

Acton Canal Wharf

Booked To Wait

a. 1316

d. 1319

p. 1325

Neasden Engineers Sdgs

Driver Changes Ends
Shunting Move

a. 1330

d. 1334

Schedule Info

Departing Wed 10/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H21768 (8859933)
Schedule Type WTT
Duration 00 hrs 41 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2200
Service Type Aggregates (B4)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In