Train 6F39 Middlesbrough (Fhh) to Boulby Mine Carlin How Fhh

Operated By Freightliner, Runs Only If Required

Newport East Jn

1min Pathing Allowance

GL2

p. 1823

Tees Yard Signal Box

Reversal / Run Around
Booked To Wait

GL

a. 1828

d. 1855

p. 1859

Middlesbrough

1min Pathing Allowance

Plat 2 SL

p. 1903

p. 1910

p. 1913

Redcar Central

1min Pathing Allowance

p. 1916

Longbeck

2min Eng. Allowance
2min Pathing Allowance

p. 1920

Crag Hall S.B.

Token or Staff Exchange

a. 1947

d. 1948

Schedule Info

Departing Fri 12/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H21546 (8859830)
Schedule Type WTT
Duration 01 hrs 55 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type RfD Chemicals (UK Contracts) (J5)
Characteristics Runs as required
Service Code 57623070
Flow Info Freightliner Heavy Haul - Potash
Member Info Log In