Train 6F26 Boulby Mine Carlin How Fhh to Middlesbrough (Fhh)

Operated By Freightliner, Runs Only If Required

Crag Hall S.B.

Token or Staff Exchange

a. 1853

d. 1854

p. 1921

Redcar Central

4min Pathing Allowance

p. 1924

Shell Junction

1min Pathing Allowance

GL

p. 1932

Grangetown (Cleveland)

Booked To Wait
Stops For Operating Reasons
1min Pathing Allowance

ML

a. 1936

d. 1959

South Bank

1min Eng. Allowance

p. 2003

p. 2011

p. 2014

Tees Yard Signal Box

Reversal / Run Around

GL

a. 2018

d. 2107

p. 2110

Schedule Info

Departing Fri 12/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H21511 (8859806)
Schedule Type WTT
Duration 02 hrs 48 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 1600
Service Type RfD Chemicals (UK Contracts) (J5)
Characteristics Runs to Terminals/Yards as required
Service Code 57623070
Flow Info Freightliner Heavy Haul - Potash
Member Info Log In