Train 6F22 Boulby Mine Carlin How Fhh to Middlesbrough (Fhh)

Operated By Freightliner, Runs Only If Required

Crag Hall S.B.

Token or Staff Exchange

a. 0708

d. 0709

Longbeck

2min Pathing Allowance

p. 0736

p. 0745

p. 0748

Whitehouse Jn.(Teesside)

1min Eng. Allowance

SL

p. 0751

Middlesbrough

2min Pathing Allowance

SL

p. 0756

p. 0801

Tees Yard Signal Box

Reversal / Run Around

GL

a. 0805

d. 0827

p. 0831

Schedule Info

Departing Fri 12/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H21499 (8859798)
Schedule Type WTT
Duration 01 hrs 53 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 1600
Service Type RfD Chemicals (UK Contracts) (J5)
Characteristics Runs to Terminals/Yards as required
Service Code 57623070
Flow Info Freightliner Heavy Haul - Potash
Member Info Log In