Train 6E69 Tunstead Sdgs to Peterborough West Yard

Operated By Freightliner, Runs Only If Required

d. 0703

p. 0709

Peak Forest S.B.

1min Pathing Allowance

p. 0713

p. 0723

p. 0726

p. 0736

p. 0737

Earles Sdgs S.B.

1min Pathing Allowance

p. 0740

Bamford

1min Pathing Allowance

p. 0744

Hathersage

1min Eng. Allowance

p. 0747

p. 0750

p. 0758

Dore South Jn

Booked To Wait

a. 0801

d. 0803

p. 0816

p. 0817

p. 0818

p. 0820

p. 0829

p. 0832

Langley Mill

1min Eng. Allowance

p. 0836

Trowell Jn

1min Eng. Allowance

SL

p. 0842

Toton Centre

Booked To Wait

HL

a. 0848

d. 0849

p. 0852

p. 0854

p. 0858

p. 0900

p. 0913

p. 0921

p. 0926

p. 0927

Frisby

1min Pathing Allowance

p. 0938

Melton Mowbray

1min Pathing Allowance

p. 0943

p. 0948

p. 0953

p. 0956

p. 0958

Oakham

1min Pathing Allowance

p. 1000

p. 1005

p. 1009

p. 1012

Uffington Sb (Lincs)

1min Eng. Allowance

p. 1019

p. 1024

New England Nth Jn.

3min Pathing Allowance

GL

p. 1029

P'Boro Eastfield Jn.

Booked To Wait

a. 1037

d. 1047

a. 1050

Schedule Info

Departing Thu 11/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H21476 (8859787)
Schedule Type WTT
Duration 03 hrs 47 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2000
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In