Train 6E12 Hanwell Bridge Loop to Hitchin Engineers Sdgs

Operated By Freightliner, Runs Only If Required

p. 0301

West Ealing

1min Eng. Allowance

Plat 4 RL

p. 0303

p. 0305

Acton Main Line

Booked To Wait

a. 0307

d. 0310

p. 0313

p. 0316

p. 0325

Junction Road Jn

1min Pathing Allowance

p. 0328

Upper Holloway

1min Pathing Allowance

p. 0331

Harringay

2min Pathing Allowance

SL2

p. 0338

p. 0409

p. 0413

Stevenage

3min Eng. Allowance

p. 0419

Hitchin

1min Pathing Allowance

p. 0426

Hitchin Sig. K234

Driver Changes Ends
Shunting Move
Booked To Wait

a. 0429

d. 0439

Schedule Info

Departing Thu 11/07/2024
Created Wed 10/07/24 19:41
Validity 03/06/24 until 13/12/2024
Schedule ID H21457 (9930080)
Schedule Type WTT
Duration 01 hrs 45 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2200
Service Type Aggregates (B4)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In