Train 6A09 Merehead Quarry (Fhh) to Hanwell Bridge Loop

Operated By Freightliner, Runs Only If Required

Merehead Quarry (Fhh)

Shunting Move

d. 2326

Whites Crossing Sdg

Driver Changes Ends
Shunting Move

a. 2332

d. 2335

p. 2359

Clink Road Jn

1min Eng. Allowance

p. 0001

p. 0007

p. 0009

p. 0011

p. 0020

p. 0034

Chippenham

4min Pathing Allowance

p. 0039

Wootton Bassett Jn

1min Eng. Allowance

p. 0057

p. 0106

ML

p. 0121

Wantage Road

1min Pathing Allowance

p. 0125

Foxhall Jn

1min Eng. Allowance

GL

p. 0132

p. 0135

p. 0136

Goring & Streatley

1min Eng. Allowance
4min Pathing Allowance

RL

p. 0144

Reading West Jn

1min Pathing Allowance

RL

p. 0157

Reading

Booked To Wait

Plat 15 URL

a. 0201

d. 0204

Kennet Bridge Jn

2min Pathing Allowance

RL

p. 0207

p. 0214

p. 0221

p. 0227

p. 0235

p. 0238

p. 0239

Schedule Info

Departing Wed 10/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H21290 (8859687)
Schedule Type WTT
Duration 03 hrs 15 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 4200
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In