Train 0M62 Barrow Hill Up Sdgs No 2-3 to Hope (Earles Sidings) Fhh

Operated By Freightliner, Runs Only If Required

Beighton Jn

2min Pathing Allowance

p. 1209

p. 1214

Woodburn Jn

1min Eng. Allowance

p. 1220

Sheffield

Booked To Wait

a. 1225

d. 1228

Heeley Up Loop

Booked To Wait

a. 1233

d. 1250

p. 1253

p. 1255

Bamford

1min Eng. Allowance

p. 1306

Schedule Info

Departing Thu 11/07/2024
Created Wed 21/02/24 20:42
Validity 03/06/24 until 13/12/2024
Schedule ID H21214 (8859651)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By Freightliner
Timed For 75mph
Power Type Diesel Locomotive
Service Type Light Locomotive (ZZ)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In