Train 3J04 Kings Norton Ot Plant Dept to London Marylebone

Operated By Freightliner, Runs Only If Required

Kings Norton Signal Sy528

Stops For Operating Reasons

a. 2056

d. 2058

Kings Norton Signal Sy522

Driver Changes Ends

a. 2100

d. 2105

Kings Norton

1min Eng. Allowance

p. 2108

p. 2112

p. 2116

Birmingham New Street

Booked To Wait

Plat 8 DEL

a. 2119

d. 2120

p. 2122

p. 2127

p. 2131

p. 2139

Hatton

1min Eng. Allowance
3min Pathing Allowance

p. 2148

Leamington Spa

Booked To Wait

a. 2159

d. 2211

p. 2224

p. 2232

Banbury

Booked To Wait

a. 2235

d. 2245

Aynho Jn

5min Pathing Allowance

p. 2251

Bicester South Junction

4min Eng. Allowance

p. 2307

Haddenham & Thame Parkway

1min Pathing Allowance

p. 2323

Princes Risborough

Driver Changes Ends

a. 2331

d. 2336

p. 2345

Marsh Lane Level Crossing

2min Pathing Allowance

p. 2347

Aylesbury

Stops For Operating Reasons
Driver Changes Ends

a. 2355

d. 2359

p. 0010

p. 0027

p. 0030

Chorleywood

1min Pathing Allowance

p. 0039

p. 0044

Harrow-on-the-hill

2min Pathing Allowance

p. 0056

Neasden South Jn

2min Pathing Allowance

p. 0102

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 15/05/2025
Schedule ID H16689 (10465089)
Schedule Type WTT
Duration 04 hrs 19 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Service Type Departmental (DD)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 54606570
Flow Info Freightliner Infrastructure - Non Possession trains
Member Info Log In