Train 7A30 Merehead Quarry (Fhh) to Hanwell Bridge Loop

Operated By Freightliner, Runs Only If Required

Merehead Quarry (Fhh)

Shunting Move

d. 0157

Whites Crossing Sdg

Driver Changes Ends
Shunting Move

a. 0203

d. 0205

p. 0214

p. 0222

p. 0229

p. 0232

Fairwood Jn

3min Pathing Allowance

p. 0237

p. 0244

p. 0254

p. 0310

p. 0329

Hungerford

1min Eng. Allowance

p. 0336

p. 0348

Theale

1min Eng. Allowance

p. 0404

p. 0410

p. 0412

p. 0414

p. 0415

p. 0421

p. 0430

p. 0438

GL

p. 0443

UDG

a. 0449

d. 0451

p. 0452

p. 0457

p. 0501

p. 0502

a. 0504

Schedule Info

Departing Fri 26/04/2024
Created Tue 15/08/23 00:10
Validity 15/12/23 until 31/05/2024
Schedule ID H12104 (6848739)
Schedule Type WTT
Duration 03 hrs 07 mins

Train Info

Operated By Freightliner
Timed For 45mph
Power Type Diesel Locomotive
Timing Load 4200
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In