Train 6M03 Barrow Hill Up Sdgs No 2-3 to Hope (Earles Sidings) Fhh

Operated By Freightliner, Runs Only If Required

d. 1200

p. 1202

Beighton Jn

1min Pathing Allowance

p. 1209

p. 1214

Woodburn Jn

1min Eng. Allowance

p. 1220

p. 1223

Sheffield

Booked To Wait

a. 1225

d. 1228

Heeley Up Loop

Booked To Wait

a. 1234

d. 1249

p. 1253

Dore West Jn

1min Pathing Allowance

p. 1254

p. 1257

p. 1303

p. 1307

p. 1310

a. 1312

Schedule Info

Departing Thu 28/03/2024
Created Tue 15/08/23 00:10
Validity 12/12/23 until 30/05/2024
Schedule ID H10880 (6848322)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622970
Flow Info Freightliner Heavy Haul - Aggregates
Member Info Log In