Train 6F72 Saltley Emr Gbrf to Liverpool Emr Gbrf

Operated By GBRf, Runs Only If Required

d. 1923

p. 1928

Washwood Heath West Jn

Booked To Wait

UDS

a. 1930

d. 1938

Bromford Bridge

1min Pathing Allowance

p. 1941

Park Lane Jn West Mids

1min Eng. Allowance

p. 1949

p. 2012

p. 2014

Pleck Jn

12min Pathing Allowance

p. 2017

Darlaston Jn

4min Pathing Allowance

p. 2032

p. 2044

Penkridge

1min Eng. Allowance

p. 2054

p. 2101

Madeley (Staffs)

1min Eng. Allowance

SL

p. 2120

Crewe

Crew Change (if necessary)

a. 2131

d. 2133

p. 2137

p. 2145

p. 2151

p. 2153

Weaver Jn

6min Pathing Allowance

p. 2155

p. 2207

Winwick Jn

Booked To Wait

a. 2217

d. 2238

p. 2243

p. 2252

p. 2256

Roby

Booked To Wait
2min Eng. Allowance

a. 2257

d. 2312

p. 2320

Edge Lane Jn

Booked To Wait

a. 2322

d. 2327

p. 2342

Bootle Jn Stop Board

Stops For Operating Reasons

a. 2345

d. 2347

Strand Road Level Crossing

Stops For Operating Reasons

a. 2352

d. 0005

Schedule Info

Departing Tue 04/02/2025
Created Fri 04/10/24 20:22
Validity 17/12/24 until 16/05/2025
Schedule ID H10874 (10751336)
Schedule Type WTT
Duration 04 hrs 57 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 1800
Service Type Metals (B1)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 55463485
Flow Info Tata Steel
Member Info Log In