Train 6A10 Merehead Quarry (Fhh) to Hanwell Bridge Loop

Operated By Freightliner, Runs Only If Required

Merehead Quarry (Fhh)

Shunting Move

d. 2351

Whites Crossing Sdg

Driver Changes Ends
Shunting Move

a. 2357

d. 0002

p. 0011

p. 0019

p. 0026

Clink Road Jn

1min Eng. Allowance

p. 0028

p. 0033

p. 0036

p. 0043

p. 0059

p. 0117

Hungerford

1min Eng. Allowance

p. 0123

Newbury

1min Pathing Allowance

p. 0133

Theale

1min Eng. Allowance
8min Pathing Allowance

p. 0146

p. 0159

p. 0201

p. 0203

p. 0205

p. 0210

p. 0217

p. 0223

p. 0231

p. 0233

p. 0235

a. 0237

Schedule Info

Departing Thu 25/04/2024
Created Wed 29/11/23 20:40
Validity 11/12/23 until 31/05/2024
Schedule ID H08776 (8003824)
Schedule Type WTT
Duration 02 hrs 46 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 4200
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In