Train 4E97 London Gateway Gbrf to Peterborough Virtual Gbrf

Operated By GBRf

London Gateway Dep Line

Stops For Operating Reasons

a. 1903

d. 1905

Thames Haven Sig Ur882

Stops For Operating Reasons

a. 1912

d. 1912

p. 1913

p. 1922

p. 1926

Purfleet

1min Pathing Allowance

p. 1932

Rainham

1min Pathing Allowance

p. 1937

Dagenham Dock

May Stop to Allow Train to Pass

GL

p. 1940

Ripple Lane Signal 806

Stops For Operating Reasons

a. 1947

d. 1947

p. 1957

Woodgrange Park

1min Pathing Allowance

p. 2002

Forest Gate Jn

1min Pathing Allowance

EL

p. 2006

Forest Gate

May Stop to Allow Train to Pass

Plat 1 ML

p. 2007

Stratford

1min Eng. Allowance

Plat 10 AL

p. 2014

p. 2017

Lea Junction

Booked To Wait

a. 2018

d. 2019

Navarino Road Jn

2min Pathing Allowance

p. 2025

Finsbury Park

Crew Change (if necessary)

Plat 8 SL2

a. 2033

d. 2035

p. 2039

Alexandra Palace

1min Pathing Allowance

p. 2042

Bowes Park

4min Pathing Allowance

p. 2044

Ponsbourne Tunnel Sig K891

3min Pathing Allowance

p. 2102

p. 2110

Langley Sth Jn

1min Eng. Allowance

p. 2120

p. 2122

p. 2123

p. 2128

Biggleswade

1min Pathing Allowance

p. 2136

Sandy

1min Pathing Allowance

Plat 2 SL

p. 2140

Huntingdon

1min Eng. Allowance

Plat 3 SL

p. 2155

p. 2206

Fletton Jn.

1min Pathing Allowance

p. 2212

Schedule Info

Departing Sat 05/07/2025
Created Wed 07/05/25 20:30
Validity 24/05/25 until 13/12/2025
Schedule ID H05858 (12474288)
Schedule Type WTT
Duration 03 hrs 20 mins

Train Info

Operated By GBRf
Timed For 75mph
Power Type Diesel Locomotive
Timing Load 1600
Service Type RfD General Merchandise (UK Contracts) (J8)
Service Code 55460180
Flow Info GB Railfreight - Containers : Felixstowe - Selby
Member Info Log In