Train 4C16 Drigg Bnf to Shap Summit Quarry

Operated By DCR, Runs Only If Required

d. 1340

Sellafield

Stops For Operating Reasons

a. 1345

d. 1345

St Bees

Token or Staff Exchange

a. 1354

d. 1355

Whitehaven

Stops to Amend Train Formation
Booked To Wait

a. 1402

d. 1404

p. 1408

p. 1413

Workington

2min Pathing Allowance

p. 1421

p. 1431

Wigton

2min Eng. Allowance

p. 1451

p. 1504

Bog Jn

Stops to Amend Train Formation
Crew Change (if necessary)

GL

a. 1508

d. 1513

p. 1515

Plumpton U.G.L.

Stops to Amend Train Formation
Booked To Wait

a. 1531

d. 1600

Penrith North Lakes

2min Pathing Allowance

p. 1605

Eden Valley

Stops to Amend Train Formation
Booked To Wait
1min Pathing Allowance

a. 1614

d. 1628

Shap Summit

3min Pathing Allowance

p. 1640

Tebay

Stops to Amend Train Formation
Reversal / Run Around

a. 1650

d. 1712

Shap Summit

Stops For Operating Reasons

a. 1722

d. 1724

Schedule Info

Departing Wed 05/02/2025
Created Wed 08/01/25 21:20
Validity 27/01/25 until 16/05/2025
Schedule ID H04448 (11527570)
Schedule Type WTT
Duration 03 hrs 49 mins

Train Info

Operated By DCR
Timed For 75mph
Power Type Diesel Locomotive
Timing Load 400
Service Type Aggregates (B4)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 52660490
Flow Info DRS Construction
Member Info Log In