Train 6M49 Hanwell Bridge Loop to Neasden Charrington Flhh

Operated By Freightliner, Runs Only If Required

d. 1319

p. 1321

West Ealing

1min Eng. Allowance
1min Pathing Allowance

Plat 4 RL

p. 1323

p. 1327

Acton Main Line

Crew Change (if necessary)

a. 1329

d. 1331

p. 1334

p. 1336

p. 1340

p. 1342

Neasden Engineers Sdgs

Driver Changes Ends
Shunting Move

a. 1345

d. 1349

a. 1354

Schedule Info

Departing Fri 29/03/2024
Created Tue 31/10/23 20:40
Validity 11/12/23 until 31/05/2024
Schedule ID H03267 (7724379)
Schedule Type WTT
Duration 00 hrs 35 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2200
Service Type Aggregates (B4)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 57622972
Flow Info Mendip Rail Traffic
Member Info Log In