Train 6H54 Hull Coal Terminal (Gbrf) to Drax Aes (Gbrf)

Operated By GBRf, Runs Only If Required

Hedon Road Sidings

Stops For Operating Reasons

a. 1653

d. 1655

Hull Dock Security Gates

Stops For Operating Reasons

a. 1700

d. 1702

p. 1714

Spring Bank South Jn

1min Pathing Allowance

p. 1727

p. 1732

p. 1736

Brough

2min Pathing Allowance

p. 1746

p. 1756

Howden

1min Eng. Allowance

p. 1803

p. 1816

Hambleton West Jn.

1min Eng. Allowance

p. 1825

Milford Jn.

2min Eng. Allowance

p. 1834

Ferrybridge North Jn

1min Eng. Allowance

p. 1843

p. 1846

p. 1854

p. 1858

a. 1910

Schedule Info

Departing Tue 10/06/2025
Created Tue 21/01/25 21:42
Validity 19/05/25 until 12/12/2025
Schedule ID H02666 (11684102)
Schedule Type WTT
Duration 02 hrs 34 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2200
Service Type Coal (Electricity) MGR (E0)
Characteristics Runs as required
Service Code 56461880
Flow Info GB Railfreight : Biomass (Drax)
Member Info Log In