Train 6H08 Drax Power Station to Tunstead Sdgs

Operated By DB Cargo, Runs Only If Required

p. 1829

p. 1831

p. 1850

Shaftholme Jn

1min Eng. Allowance
2min Pathing Allowance

p. 1854

Doncaster

Booked To Wait

a. 1904

d. 1909

p. 1911

Belmont Down Yard

Booked To Wait
Crew Change (if necessary)
Reversal / Run Around

a. 1916

d. 2210

p. 2215

p. 2216

Hexthorpe Jn

Booked To Wait

a. 2220

d. 2224

p. 2232

p. 2235

p. 2237

p. 2241

Holmes Jn

3min Pathing Allowance

p. 2242

Wincobank Jn.

1min Eng. Allowance
2min Pathing Allowance

p. 2247

Sheffield

Booked To Wait
Crew Change (if necessary)
2min Pathing Allowance

a. 2255

d. 2300

p. 2309

Dore West Jn

1min Pathing Allowance

p. 2310

Totley Tunnel East

4min Pathing Allowance

p. 2313

Bamford

1min Eng. Allowance

p. 2326

p. 2334

p. 2341

Chinley Signal Cy168

Booked To Wait

a. 2347

d. 2348

Peak Forest S.B.

Booked To Wait

a. 2357

d. 2359

p. 0002

a. 0008

Schedule Info

Departing Wed 05/02/2025
Created Wed 25/09/24 20:17
Validity 18/12/24 until 14/05/2025
Schedule ID H00006 (10493800)
Schedule Type WTT
Duration 05 hrs 53 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 52122422
Flow Info DBC UK: Dowlow - Walsall
Member Info Log In