Train 6H08 Drax Power Station to Dowlow Briggs Sdgs

Operated By DB Cargo, Runs Only If Required

p. 1829

p. 1831

p. 1850

Shaftholme Jn

1min Eng. Allowance
2min Pathing Allowance

p. 1854

Doncaster

Booked To Wait

a. 1904

d. 1909

p. 1911

Belmont Down Yard

Booked To Wait
Crew Change (if necessary)
Reversal / Run Around

a. 1916

d. 2210

p. 2215

p. 2216

Hexthorpe Jn

Booked To Wait

a. 2220

d. 2224

p. 2232

p. 2235

p. 2237

p. 2241

Holmes Jn

3min Pathing Allowance

p. 2242

Wincobank Jn.

1min Eng. Allowance
2min Pathing Allowance

p. 2247

Sheffield

Booked To Wait
Crew Change (if necessary)
2min Pathing Allowance

a. 2255

d. 2300

p. 2309

Dore West Jn

1min Pathing Allowance

p. 2310

Totley Tunnel East

4min Pathing Allowance

p. 2313

Bamford

1min Eng. Allowance

p. 2326

p. 2334

p. 2341

Great Rocks Jn

Token or Staff Exchange

a. 2354

d. 2355

p. 0002

Buxton S.B.

Token or Staff Exchange

a. 0009

d. 0010

Buxton Urs

Reversal / Run Around

a. 0015

d. 0039

Buxton S.B.

Token or Staff Exchange

a. 0044

d. 0045

Briggs Ground Frame

Stops For Operating Reasons

a. 0056

d. 0058

Schedule Info

Departing Mon 03/02/2025
Created Tue 08/10/24 19:40
Validity 16/12/24 until 15/05/2025
Schedule ID H00003 (10796432)
Schedule Type WTT
Duration 06 hrs 47 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 52122422
Flow Info DBC UK: Dowlow - Walsall
Member Info Log In